ATYS M6S PDF

This performance level is the product of the technology employed: operation in vacuum, magnetic bearings for operation with levitation, synchronous motor, cooling system which is activated when the temperature is high. As a general rule, it takes approximately 2 minutes. The time depends on the power of the UPS charger. For certain applications, it is possible to obtain a back-up time of 20 seconds by adapting the UPS charger.

Author:Faugal Kagasida
Country:Belize
Language:English (Spanish)
Genre:Music
Published (Last):19 September 2014
Pages:199
PDF File Size:3.20 Mb
ePub File Size:14.8 Mb
ISBN:815-2-13567-356-6
Downloads:78860
Price:Free* [*Free Regsitration Required]
Uploader:Malalrajas



This performance level is the product of the technology employed: operation in vacuum, magnetic bearings for operation with levitation, synchronous motor, cooling system which is activated when the temperature is high. As a general rule, it takes approximately 2 minutes. The time depends on the power of the UPS charger. For certain applications, it is possible to obtain a back-up time of 20 seconds by adapting the UPS charger.

Flywheels can be placed into two categories depending on the speed of rotation. The energy stored by the rotating weight is proportional to the speed squared; if the speed is increased, the rotating weight can be reduced. The advantage of low-speed systems is that they have a relatively simple design.

However, the power they produce is low in relation to their mass and they have numerous mechanical bearings which create friction which in turn consumes energy and reduces output. The advantage is that a sizeable power is obtained for a low mass, it is very compact, there is no friction, output is higher and there is a reduced need for maintenance.

There is no friction and therefore no losses and no requirement for bearings to be maintained. The design of the equipment is based on "plug and play" with only one connection needed to the UPS direct current bus. The cabinet can be moved on a pallet truck. The equipment has wheels so it can be moved around. Numerous tests were carried out in the development stages to ensure that there would be no danger in the event of a major incident.

Certain internal functions require an alternative source of or V at 50 or 60 Hz. The UPS output provides this voltage. Width: mm - Depth: mm - Height: mm The dimensions are such that the equipment can be moved through a standard-sized door frame It weighs kg, This minimises the load on the ground. The system that creates the vacuum, in the space where the inertia wheel rotates, is built into the rotary assembly; it does not require maintenance or replacement. It maintains a constant vacuum, almost like in space, which is a million times lower than atmospheric pressure, removing nearly all aerodynamic resistance which in turn reduces losses.

This systems removes the necessity for an external vacuum pump which consumes electrical energy, requires regular maintenance and which might need to be replaced. A flywheel is a "mechanical battery" which stores electrical energy using a rotating weight. The energy can be permanently tapped into. Just as a chemical battery is kept floating, a flywheel is kept in rotation by its connection with a direct current bus from the output of a UPS charger.

Available energy is proportional to the speed squared. Thus, when the flywheel is at full speed, the entire amount of energy is available. The information can be viewed on the LCD display. With a load of kW, the back-up time will be 5 seconds, for kW: 15 seconds, kW: 20 seconds, 60 kW: 40 seconds.

However, it is possible to increase this number according to power needs and redundancy. The UPS supplies power back-up in cases of electrical network failure. However, this back-up may not be enough to cover longer cut-offs and you may not be there yourself to correctly close-down your files and your IT system.

LOCAL VIEW communication software is designed to automatically carry out all the necessary operations to closedown your system before the end of battery back up. The distribution of electrical power is often subject to short and long term interference. Using an instantaneous back-up power supply means you can protect your IT system against such interference which can come from the industrial and atmospheric environment, as well as from your own environment. The following table lists the most common sorts of power supply problems, and the consequences for badly protected users:.

Keyboard lock, system breakdown leading to data distortion or loss, reduction in equipment performance and lifespan. Breakdowns, electronic component wear-and-tear, destruction of hard disks. Data-loss, badly shut-off applications, equipment damage and problems when re-activating applications. Program and database errors. Badly damaged components and equipment, data-loss.. A UPS able to provide perfect quality current is therefore an indissociable complement to a gen-set. The UPS will, however, ensure supply back up.

Yes and no. Quality of power supply Certain IT equipment top-of-the-range workstations, for example requires good quality current when the UPS is running on battery.

We favour a UPS which produces a sine wave out-put signal. Voltage control The UPS must be able to control voltage should the variations be too high. Communication software Should the IT system be running on a network, it will be necessary to use software which enables the UPS to be controlled via the network.

Perfect quality The availability of a critical server is fundamental to your company. As for a local server, great care must be taken over the quality of the current supplied by the UPS. Extending back-up time You could need longer back-up time, therefore it's important to easily add supplementary batteries to your UPS.

To guarantee this you should choose a UPS which permanently controls voltage and frequency. Changing over to battery operation should be completely seamless, i. ATEX enclosures are intended for use in dusty explosive atmospheres in category 2D. Zone 21 and The CT inputs are insulated through galvanic isolation therefore, as a result, the secondary can be earthed.

To remotely order into position 0, you must close terminals , and The ATyS 6e and 6m check the phase rotation consistency with the network via a manual mode.

The switch can be forced into OFF emergency stop by inhibiting automatic operation and then remotely ordering the switch into position 0. Connect terminals inhibit automatic operation and position 0 order.

Please see the attachement. The auxiliary contact for AUT status is located on terminals In standard products, padlocking is only possible in position 0.

For padlocking in all 3 positions, a factory fitted accessory is required which must be ordered at the same time as the switch see your catalogue. In case of longer distance, insert control relays. The ATyS 3e, 6e and 6m are equipped with a NO auxiliary contact which closes when the padlocking lever is extended.

The auxiliary contatct for padlocking status is located on terminals With regards to space, how many modules are required in order to integrate an ATyS C30 controller into a modular panel? One module is approx. The ATyS C30 is mm wide, which equals 6. The internal supply of the controller is fed from terminals and When it is a single-phase network with neutral 1BL , it is necessary to connect terminal neutral to terminal The supply measurement is taken between terminals and No, this is not possible.

The voltage sensing is always upstream of the ATyS, directly on the sources. See attachement. It is not a fault contact, it is a "Device Available" contact.

The source availabilty LED does not illuminate. Before a source is shown as available, what must the ATyS first verify? What is the minimum permissible time between the opening of a pre-break auxiliary contact and the poles of a switching device? The minimum time between the operation of the auxiliary contact and the operation of the switch contacts is 20 ms.

The ATyS D10 enables source availability and switch position to be displayed on the panel front. What is the maximum current for an auxiliary contact of U type and under a rated voltage of V? For bars 9x2x0,8 to 40x10x1 apply a coefficient of 1. For bars 50x3x1 to 80x10x1 apply a coefficient of 1,65 for 2 parallel bars and a coefficient of 2,12 for three bars in parallel.

For bars x4x1 to x12x1 apply a coefficient of 1,60 for 2 parallel bars and a coefficient of 2,02 for three bars in parallel. For enclosure height mm: Reference For enclosure height mm: Reference For enclosure height mm: Reference For enclosure height mm: Reference Not reference available.

Factory fitted. A customer owns a cabinet which is 8 mm thick. The auxiliary contacts are located either after the switch terminals or at the bottom, at fixation level. Remember that this is only possible if the different loads come from the same mains network, and that the voltages are the same.

European directive transcribed into national laws in the EU countries : its application depends on each country and concerns only the EU. In general, all meters where a financial transaction occurs are concerned. Moreover, even if there is no financial transaction, a MID certified meter is always a better proof than a standard meter. Do a Wiring test press the main button for 3s and check the error number to know which wiring error has been made see instruction sheet to know the detailed correspondence.

The disc contains 3 blocked slots, each dedicated to one switch position I,0,II. The locking position is configured by opening up cutting out the required slot, therefore enabling the choice of locking position. The S type handle enables the deafeat of door interlocking in positions 1 and 2. The use of a tool is required for defeating a door interlocked handle.

Devices communicate through the modbus function 3.

APPLIED ECONOMETRICS ASTERIOU HALL PDF

AOSIF 4000A 4P copper automatic transfer switch ATS for generator changeover

It can transfer the load between mains power and mains power or between mains and generator in few seconds. It can automatically detect the voltage and frequency of mains power or generator power timely. It has larger isolation distance to withstand higher impact voltage above 8KV. Standard ATS. It has 2 road power connection : Generator power and mains power.

ETAPA PRELINGUISTICA Y LINGUISTICA PDF

Häufig gestellte Fragen

This performance level is the product of the technology employed: operation in vacuum, magnetic bearings for operation with levitation, synchronous motor, cooling system which is activated when the temperature is high. As a general rule, it takes approximately 2 minutes. The time depends on the power of the UPS charger. For certain applications, it is possible to obtain a back-up time of 20 seconds by adapting the UPS charger. Flywheels can be placed into two categories depending on the speed of rotation. The energy stored by the rotating weight is proportional to the speed squared; if the speed is increased, the rotating weight can be reduced.

EL ARTE DE ACONSEJAR BIBLICAMENTE PDF

Frequently asked questions

See attachement. See attachement READ. Procedure for the configuration of the neutral position: 8. If the network is not recognised by the ATyS M6s or if we wish to change the neutral position, proceed as follows: - Step 1 : Open the Manual operating cover. Step 1: It is necessary to first connect the ATyS M6s to a 3 phase and neutral supply 4NBL to enable configuration of the neutral position neutral position is detected upon initial start-up. Step 2 : Connect auto-transformers.

DESCARGAR NUTRIOLOGIA MEDICA ESTHER CASANUEVA PDF

Automatic transfer switch

Die langsam drehenden Systeme weisen den Vorteil eines relativ einfachen Konzeptes auf. Die Vorteile hiervon sind hohe Leistung bei geringem Gewicht, Kompaktheit, nicht vorhandene Reibung, hoher Wirkungsgrad sowie ein geringer Wartungsbedarf. Die Anlage wird nach dem Prinzip "Plug and Play" installiert. Der Schrank kann auf einer Palette transportiert werden. Die Energie kann permanent abgegeben werden. Das System zur Bereitstellung des Vakuums im Bereich, in dem das Schwungrad dreht, ist in der Rotationsbaugruppe integriert. Es muss weder gewartet, noch ausgetauscht werden.

Related Articles